A Non-Federal Development at a Federal Project
The Colebrook River Lake project is a Corps of Engineers multipurpose reservoir located in northwestern Connecticut. The hydro project, designed and built by the Catalyst Energy Corporation...

Post-Audits of Environmental Programs and Projects
This is the proceedings of a session at the ASCE Convention, New Orleans, October 1989. Post-audits include evaluation, assessment, and audit of the effects, both intended and unintended,...

Marketing a Public-Private Small Scale Hydro Project: Case History, Kent County, Michigan
In 1982, Kent County, Michigan faced an interesting dilemma. Back in 1965, they had purchased the Fallasburg Dam and powerhouse from Consumers Power Company for 1. Without putting funds...

Studies of Fish Protection Methods at Hydroelectric Plants
Five largely untested but economical fish-protection systems were tested at sites throughout North America. The process of selecting laboratory and field test sites was completed at the...

Feasibility of Cold Water Releases from Lake Britton
The Pit River in Shasta County, California, is the site of the Pit 3, 4 and 5 Project, a major hydroelectric facility operated by the Pacific Gas and Electric Company (PGandE) under Federal...

Columbia River Treaty Perspectives
The Columbia River Treaty was signed in 1961 and ratified by the governments of Canada and the United States in 1964. The Treaty required British Columbia to construct three large storage...

Designing a Modern Small-Scale Hydroelectric Plant
STS Consultants, Ltd. (STS) and Skidmore, Owings & Merrill (SOM) successfully teamed on four hydropower sites in Michigan during the 1980's. Three of the four sites...

Lake Tap?Crater Lake
The Crater Lake Phase of the Snettisham Hydroelectric Project has been designed and is currently under construction. This paper describes the design and construction of the lake tap which...

Osoyoos Lake Control Structure
The new Osoyoos Lake Control Structure has been built on the Okanogan River at Oroville, Wa. The site is about 2 miles downstream from the outlet of Osoyoos Lake, and about 9 miles south...

Case Study: Siphon Penstock Operations
Hydroelectric power plants utilizing siphon penstocks operating near Winter, Wisconsin and at Jim Falls, Wisconsin have met or exceeded expectations after fine tuning of the vacuum and...

Long Lake Dam Model Studies
The Long Lake spillway was designed at the turn of the century as a standard ogee section with an upstream batter for a maximum head of 179 feet (55 m). It did not include any energy dissipator....

Hydropower in the Kodiak National Wildlife Refuge
The Terror Lake Hydroelectric Project is unique in that it is the only energy project to be constructed in a National Wildlife refuge. A National Wildlife Refuge has few equals to blocking...

Hydropower Development at North Hartland Lake, Vermont
The purpose of this paper is to give a short history of the first hydropower development by non-Federal interests at a Corps of Engineers flood control dam and reservoir within the jurisdiction...

Determining Impacts of Sediment Using Cesium-137
Tecumseh Lake, in east-central Oklahoma, completed about 1934, has been identified by the Oklahoma Water Resource Board as a water supply critical to future development of the state. Aerial...

Trends and Emerging Issues: A Longitudinal Study of Government Agencies' Perceptions of Great Lakes Water Resources and Related Issues
The perceptions of government agencies with jurisdiction over Great Lakes' shoreline has changed over time with respect to important issues related to water quality and a...

The Remedial Action Plan for the Fox River, Wisconsin
The nature of and need for Remedial Action Plans (RAP) in 42 areas of the Great Lakes is reviewed with special attention given to the Fox River and Lower Green Bay area. A brief historical,...

Hydrogeology of a Barrier Island System, Nags Head, North Carolina
The purpose of this research was to understand the dynamics of the water table prior to the start of municipal pumping and to predict the effect that the pumping would have upon the water...

Great Lakes Levels: Toward Systematic Decision Making
The International Joint Commission (IJC) has authority given by the governments of Canada and the United States to use existing works to regulate the lakes system according to agreed-to...

Risk Assessment of Lake Shore Development of Devils Lake, North Dakota
In recent years, the advent of the flood insurance programs has forced developers, financiers, and planners to deal with future high water conditions and associated risks. A reliable method...

Issues in Regional Water Resources Planning and Management: A Great Lakes Case Study
This paper focuses on the obstacles and opportunities inherent in regional resource management efforts, with the Great Lakes Basin serving as a case study. The following areas are addressed:...

 

 

 

 

Return to search